PROJECT LOCATION : | KONYA |
---|---|
PROJECT OBJECTIVE : | THE AİM OF THE PROJECT İS TO PROVİDE THE NECESSARY COOLİNG SYSTEMS FOR THE HOSPİTAL DİNİNG HALL AND LABORATORY. THE PROJECT İNCLUDES 3 PCS -18°C/-21°C DEEPFREEZE STORAGE, 19 PCS -5°C/+5°C COLD STORAGE AND 2 PCS +12°C AMBİENT COOLİNG AREAS İN TOTAL. |
COOLING SYSTEM : | TAMGUC COOLING SYSTEMS |
DOORS : | TAMGUC COOLING SYSTEMS |